Friday, 25 May 2012

Week 11/12 - Project 3 Requirements


510 Project 3 Brief

Your submission should include the following:
1. Detailed Site Plan including Entry / Exit Sequence
2. A Site Elevation
3. Complete Floor Plans showing appropriate development of every briefed area.
4. 2 elevations Showing Materiality of your Building
5. 2 Sections
6. Exterior Facades with Materials
7. Detailed Massing
8. 2 Detailed Spaced (Minimum 1 Exhibition Space – interior or exterior)
9. 2 Detailed Exhibits
10. 2 Rendered Views (Interior or exterior)
11. A Circulation diagram or facility map
12. A Narrative maximum 300 words capturing your core concepts and metaphor and relating them to your facility.

*you can combine elements above.

No comments:

Post a Comment